No License to Cover has been filed with the FCC yet.
Instead, a Modification to the existing Construction Permit to have the ERP be 870 kW was filed on 8/24/2024, noting it being an increase from their current allowed 642 kW. It's not yet approved (as of today, 9/4/2024).
I'll guess that when the technical consultants/engineers arrived onsite, they found something in the transmission chain that wasn't ready to go to 1000 kW. Their further review determined that 870 kW is possible with all existing equipment.
I'm also not finding a posting on the WSYM website about completing the upgrade. I haven't tried checking their Facebook or X for any message.
I'll watch for further FCC filings, of course. Seems like that's my modus operandi, eh?
Cheers!
Statmanmi